
Development of a retail complex and urban infrastructure in Foumbot
Feasibility study and design of infrastructure integrating transport, retail and solar-powered lighting
N° 612
📍 Cameroon
🗓 07/2016 – 10/2016
€ 51,046
Client : City of Foumbot
Financing: Kreditanstalt für Wiederaufbau (KfW)
Partner : ERA Cameroun, Urbaplan
Services
Project Description
Preparation of feasibility studies for the construction of a market, a bus station and a solar-powered public lighting system in the city of Foumbot, Cameroon.
Provided services by Urbaconsulting
- Conducted a comprehensive diagnostic assessment of existing infrastructure, as well as the socio-economic, financial and environmental context of the project area.
- Carried out surveys, stakeholder consultations and focus group discussions within the existing market and bus station.
- Developed and assessed several development scenarios for the proposed infrastructure, including institutional arrangements, tariff analysis and environmental and social considerations.
- Produced preliminary technical designs and conceptual layouts for the future market, bus station and public lighting infrastructure.
Would you like to stay informed about our latest news ?
Follow us on LinkedIn !
Comments are closed